The end of Week 6:
I would say that the framing is 95% complete.
On Saturday they finished a lot of little items that will add to the detail of our home.
BARREL CEILING in Foyer (looking in above, and out below)
Arched doorways
42" Countertop height Kitchen Island Framing
Installation of all the Pocket Doors
Attic Decking and Walkways
Cubby hole spaces underneath roof for extra storage
View from the back, they moved the chimney to the proper place
Back porch - brick & stone will be on the lower half of the walls
Arched Garage door openings
Cedar shake siding on the dormers
Front porch
Faux double column look on front porch