The painters finished the main portion of their painting. According to our builder, they will be here up till close to do touch-ups.
Living Room |
Master Bedroom |
Study next 3 pictures |
Laundry Room and Mudroom Area |
The countertop installers showed up yesterday and installed our granite and quartz countertops.
The driveway was poured while we gone along with the sidewalk and pads for the air conditioner and generator. However, after coming back from vacation, we noticed that the sidewalk nor the pads were done correctly, so they will be broken up and re-poured.
Also this week the tile installers showed up and started their work. First with setting the shower bases and waterproofing membrane. The last few days have been taken up with the Master bath and shower area, since this the most complex and biggest part of the job. The other areas are the guest s
shower, Kitchen backsplash and upstairs tile floors in the bathrooms.